Browsing Tag
LRT 1-Cavite Extension
3 posts
LRT-1 Cavite Extension expected to be operational in September 2024 — DOTr
The construction of LRT-1 Cavite Extension is said to be "on track and in fast-taking shape," with operations expected to begin in September 2024, according to the Department of Transportation on Monday
November 14, 2022
LRT-1 Cavite Extension is 57 percent complete – DOTr
CAVITE – The 64.9-billion-peso LRT-1 Cavite Extension, which connects Baclaran and Bacoor City, now has a 57 percent…
July 22, 2021
LRT-1 Cavite Extension nasa 55.6 porsyento nang tapos
Nasa 55.6 porsyento nang tapos ang isinasagawang LRT-1 Cavite East Extension, ayon sa Department of Transportation (DOTr) noong Mayo 21.
June 16, 2021